What's being built in Lakeland
353 projects on the public record in Lakeland, Florida — what's proposed, where it stands, and what happens next. Every claim links to the document it came from.
Under Construction 115
-
Under ConstructionRetail & Dining
Chick-fil-A and Chipotle are filling in a new retail corner at Florida Avenue and Shepherd Road
A vacant lot at S Florida Avenue and Shepherd Road is being split into commercial pads, including a Chick-fil-A and a Chipotle in a new shell building.
-
Under ConstructionIndustrial
Apex Logistics is building a 202,000-square-foot warehouse on Highway 33 in North Lakeland
A roughly 202,471-square-foot warehouse called Apex Logistics is under construction at 8161 N Highway 33 in North Lakeland.
-
Under ConstructionCommercial
Modernization work underway at 1125 Bartow Road
A commercial building at 1125 Highway 98 South is undergoing modernization, including an elevator upgrade and window replacement.
-
Under ConstructionRetail & Dining
A new 7-Eleven with gas and truck fueling is going up on North Highway 98
A 4,853-square-foot 7-Eleven with passenger and truck fueling stations is taking shape at 8321 N Highway 98 in North Lakeland.
-
Under ConstructionIndustrial
JBT Marel is adding storage and mechanical space at its Fairway Avenue building in Lakeland
An existing building at 400 Fairway Ave is getting attached storage space, a new mechanical room and new JBT Marel signage.
-
Under ConstructionIndustrial
A precast concrete maker is setting up at 304 Winston Creek Parkway in North Lakeland
A custom architectural precast concrete manufacturer is renovating an existing building and adding a small on-site batch plant at 304 Winston Creek Parkway.
-
Under ConstructionIndustrial
Heritage Landscape Supply warehouse and distribution at Combee Road
Heritage Landscape Supply is leasing a warehouse on South Combee Road to operate as a wholesale distributor of landscape materials and hardscape products.
-
Under ConstructionCivic & Health
A $27 million Detroit Tigers player development academy is taking shape at Tigertown
The city-owned Tigertown complex is getting a $27.24 million Detroit Tigers player development academy, with signage now going up.
-
Under ConstructionCommercial
MidFlorida Credit Union is expanding its downtown Lakeland campus on South Florida Avenue
MidFlorida Credit Union is building out its downtown campus at 228–230 Florida Avenue South, including a five-story building and an $8 million interior buildout.
-
Under ConstructionCommercial
Dismuke Properties Remodeling Building at 1920 South Florida Avenue
A commercial building at 1920 Florida Avenue South is undergoing remodeling work.
-
Under ConstructionIndustrial
Publix is building a warehouse and return center on County Line Road
Publix Super Markets is building a warehouse and return center at 2600 County Line Road, with site work and foundation permits already in hand.
-
Under ConstructionCommercial
Electrical work at 141 Fernery Rd
Electrical and mechanical permits finaled at 141 Fernery Rd.
-
Under ConstructionCivic & Health
St. Joseph building gets door, walkway, and fence upgrades
The Diocese of Orlando is renovating a commercial building at 210 Lemon Street West.
-
Under ConstructionRetail & Dining
Publix adds printing equipment at Lanier Street location
Interior renovation to install new printing equipment at Publix Super Markets on Lanier Street West.
-
Under ConstructionCivic & Health
Beacon Hill Church adds ADA restroom at 220 Beacon Road West
Beacon Hill Fellowship is adding an accessible bathroom to its building on Beacon Road West.
-
Under ConstructionCommercial
Bell Tower retaining wall repair underway at Carillon Lakes
Maintenance work on the Bell Tower structure at Carillon Lakes includes a planter retaining wall replacement.
-
Under ConstructionRetail & Dining
Black Rooster interior remodel at 4035 South Florida Avenue
Interior buildout and signage permits finalized for Black Rooster at 4035 Florida Ave S.
-
Under ConstructionCivic & Health
Fire protection work underway at 1108 Bartow Road apartment community
Apartment complex replacing fire hydrants and updating signage.
-
Under ConstructionIndustrial
Juice Bowl Products upgrades fire protection systems
Fire suppression improvements at the juice-processing facility on Highway 98 South.
-
Under ConstructionCivic & Health
Faith in Action expands at Greater St. Paul Baptist Church
An expansion is underway at Greater St. Paul Baptist Church on Omohundro Avenue.
-
Under ConstructionIndustrial
PECO Pallet is fitting out a facility on Whitten Road
PECO Pallet is building out space at 3075 Whitten Road in Lakeland with a roughly $1.3 million interior remodel and office work.
-
Under ConstructionIndustrial
BrightStar Lottery is building out space at 4000 Frontage Road
A $2.5 million interior remodel, new warehouse racking, fire sprinklers and a lit sign point to BrightStar Lottery taking space in an Interstate Commerce Park building off the I-4 frontage road.
-
Under ConstructionCommercial
A commercial space at 820 Massachusetts Avenue is getting remodeled
A suite in a redevelopment-agency building on North Massachusetts Avenue is being built out, backed by a CRA grant request.
-
Under ConstructionIndustrial
Southern Tire Mart is setting up a wholesale warehouse on Region Court
Southern Tire Mart is fitting out a wholesale warehouse at 5200 Region Court in east Lakeland.
-
Under ConstructionCommercial
Business offices coming to 109 Kentucky Ave N
A commercial building at 109 Kentucky Ave N is being converted to office space.
-
Under ConstructionCommercial
Publix is remodeling its building at 345 Galloway Road
An interior remodel is underway inside a Publix-owned building on Galloway Road North.
-
Under ConstructionHousing
Magg-Leola Cove Apartments is taking shape on Unitah Avenue
Site work, a sprinkler system, and other early permits are moving on an apartment project at 1107 Unitah Ave in Lakeland.
-
Under ConstructionIndustrial
Advance Auto Parts distribution center roof replacement at 4900 Frontage Road South
Roof replacement and fire protection system permitted at the Advance Auto Parts distribution center on Frontage Road South.
-
Under ConstructionCivic & Health
Lakeland Fire Station 8 under construction at Mall Hill Drive
The city is building a new fire station on property at 3890 Mall Hill Drive.
-
Under ConstructionCivic & Health
Watson Clinic is building a surgery center on Lakeland Highlands Road
A new Watson Clinic ambulatory surgery center is taking shape at 4050 Lakeland Highlands Road.
-
Under ConstructionCommercial
Mavis Tires & Brakes built a new shop on Pipkin Road
A new Mavis Tires & Brakes has been built at 5335 Pipkin Road W in south Lakeland.
-
Under ConstructionCivic & Health
Orlando Health is building out a four-story Watson Clinic medical office on Lakeland Highlands Road
A four-story medical office building at 4060 Lakeland Highlands Road is getting a full interior fit-out for Watson Clinic and Anchor Health.
-
Under ConstructionCommercial
MidFlorida is building out the Oates Building on Florida Avenue downtown
MidFlorida Credit Union is remodeling and building out a multi-story building at 228–230 Florida Ave S in downtown Lakeland.
-
Under ConstructionIndustrial
O'Reilly's Lakeland distribution center is getting a major equipment overhaul
A string of permits shows conveyors, storage racking and interior work filling out the O'Reilly auto-parts distribution center on County Line Road.
-
Under ConstructionCivic & Health
Sun 'n Fun's campus is getting a new pavilion off James C Ray Drive
A $1.77 million pavilion project is under way on the Sun 'n Fun Aerospace Expo grounds near Lakeland Linder, followed by a pavilion expansion later in 2026.
-
Under ConstructionRetail & Dining
A Tractor Supply is moving into the Palm Center on South Florida Avenue
An existing storefront in the Palm Center shopping plaza is being built out into a Tractor Supply farm-and-ranch store.
-
Under ConstructionCivic & Health
Southeastern University is building an early childhood center on Crystal Lake Drive
A new $3.9 million early childhood center is going up on Southeastern University's campus off Crystal Lake Drive South.
-
Under ConstructionRetail & Dining
The Harvey's on Ariana Street is becoming a Winn-Dixie
The grocery store at 1305 Ariana Street is being reworked and re-signed as a Winn-Dixie.
-
Under ConstructionRetail & Dining
An Ashley store is taking shape at 1415 Winston Park Boulevard
A spec building off Winston Park Boulevard is being fitted out with offices, warehouse space and "Ashley" wall signs.
-
Under ConstructionCommercial
Downtown office at Heritage Plaza South gets a $650K makeover and a new tenant
A commercial office suite at 204 Orange Street East is being renovated, with signs going up for Quiddity and a refreshed Alltek face.
-
Under ConstructionCommercial
Publix is building out a downtown office on Kentucky Avenue
Publix is fitting out office space at 321 Kentucky Ave S in downtown Lakeland, on land owned by the city's redevelopment agency.
-
Under ConstructionIndustrial
Garage For Life finishes a buildout on Kendrick Lane as Nexatherm checks the zoning for a U.S. headquarters
A commercial building at 1530–1540 Kendrick Lane has been built out for Garage For Life, and recent zoning checks point to a warehouse and light-industrial headquarters for a company called Nexatherm.
-
Under ConstructionCivic & Health
Lakeland Regional Health is building out a Parkview medical office at 1409 Florida Avenue
Lakeland Regional Health is renovating a building at 1409 North Florida Avenue into its Parkview medical office building.
-
Under ConstructionCommercial
200 Lake Morton Drive gets a top-to-bottom interior makeover
Units inside the commercial building at 200 Lake Morton Drive are being renovated, from fresh fire sprinklers to a new sound system.
-
Under ConstructionIndustrial
Park 4 industrial buildings rising on University Boulevard
An industrial park known as Park 4@Lakeland is under construction off University Boulevard in southwest Lakeland.
-
Under ConstructionCivic & Health
Resurrection Catholic Church and School is renovating buildings off Old Highway 37
The Diocese of Orlando is remodeling two buildings at Resurrection Catholic Church and School in north Lakeland, a roughly $2 million project.
-
Under ConstructionCivic & Health
Polk County is building a new EMS station on Robson Street
A new emergency medical services station for Polk County is under construction at 650 Robson Street East in Lakeland.
-
Under ConstructionCommercial
Regal Kia is building a new dealership on Bartow Road
A new Kia dealership is going up on Highway 98 South in Lakeland, with an $8.5 million building and store signs already permitted.
-
Under ConstructionCommercial
A ModWash car wash is taking shape on Kathleen Road
The ModWash Express car wash at 3170 Kathleen Road has worked through building, sign, and equipment permits and is being wired up.
-
Under ConstructionCommercial
A Tesla sales and service center is going up on US 98 North
Tesla is building a new sales and service center at 3606 Highway 98 North in Lakeland.
-
Under ConstructionCommercial
123 Kentucky Ave N rehabilitation underway
Work is progressing on the rehabilitation of a building at 123 Kentucky Ave N in downtown Lakeland.
-
Under ConstructionHousing
Luxe at Lakeland apartments are rising along Luxe Drive
A 12-building apartment community with a clubhouse, pool and dog park is under construction off Pyramid Parkway in Lakeland.
-
Under ConstructionHousing
Carpenters Home Estates is renovating apartments building by building
A long-running renovation campaign is working through the apartment buildings at 1001 Carpenters Way in North Lakeland, unit by unit.
-
Under ConstructionRetail & Dining
Starbucks, Domino's and Citi Trends fill out a US 98 North shopping center
A retail strip at 3105–3195 US 98 North in Lakeland is being rebuilt and re-tenanted, with a Starbucks, a Domino's and a Citi Trends among the names going in.
-
Under ConstructionCivic & Health
Orlando Health is building a freestanding ER on Lakeland Park Center Drive
Orlando Health is building a freestanding emergency department in North Lakeland, with signage and fire systems already going in.
-
Under ConstructionCivic & Health
Victory Church adds classrooms and a ballfield on Griffin Road
Victory Assembly of God has been building out its Griffin Road campus with a dozen new classrooms, athletic fields and a fresh roof.
-
Under ConstructionRetail & Dining
Lakeside Village keeps turning over tenants off Harden Boulevard
The Lakeside Village shopping center is cycling through new tenant buildouts, signs, and upkeep, from an insurance office to the Revival Lounge.
-
Under ConstructionIndustrial
A 260,000-square-foot warehouse is going up at Lakeland Central Park
A new shell warehouse building of about 260,000 square feet is under construction on Winston Park Boulevard.
-
Under ConstructionRetail & Dining
A Kathleen Road retail center is filling up with new tenants
UPS Store, Grain and Berry, Florida Blue, The Well Society and a nail salon are building out suites in a retail center on Kathleen Road.
-
Under ConstructionCommercial
Minor remodel underway at 1248 George Jenkins Boulevard
A small commercial remodel is permitted at 1248 George Jenkins Boulevard.
-
Under ConstructionCivic & Health
Lakeland Regional keeps remodeling its Lakeland Hills campus, imaging suites and all
A steady run of interior permits is upgrading imaging, nuclear medicine and other departments at Lakeland Regional Health's main hospital.
-
Under ConstructionCivic & Health
The Detroit Tigers are building a $27 million player academy at their Lakeland spring-training home
A new player development academy is rising at the Tigers' Lakeland Hills complex, built for the City of Lakeland.
-
Under ConstructionIndustrial
Monster Energy is fitting out a guarded facility on Allen K Breed Highway
A string of permits — forklift chargers, a $700,000 interior buildout, new fencing and two guardhouses named for Monster Energy — point to the drink maker setting up at 5380 Allen K Breed Highway.
-
Under ConstructionCivic & Health
Watson Clinic's cancer center on Lakeland Hills gets an equipment upgrade
The Watson Clinic Cancer & Oncology Treatment Center at 1730 Lakeland Hills Blvd is being remodeled to swap in new equipment.
-
Under ConstructionCivic & Health
Peace River Center replaces windows at Lakeland Hills location
Window replacement project completed at Peace River Center for Personal Development's Lakeland Hills Boulevard building.
-
Under ConstructionRoads
Lakeland Hills Boulevard is being rebuilt between Parkview Place and Granada Street
The state is reconstructing the pavement on SR 33 (Lakeland Hills Blvd) along a nearly two-mile stretch in north Lakeland.
-
Under ConstructionRoads
A new bike trail is planned along SR 563 near Lake Hunter
FDOT has a bike path/trail project along SR 563 between the Lake Hunter Boat Ramp and Lime Street in Lakeland.
-
Under ConstructionRoads
US 98 and Polk Parkway intersection turn lane work to start
FDOT is modifying turn lanes at the US 98 and Polk Parkway intersection.
-
Under ConstructionCivic & Health
Lone Palm Golf Club is renovating its clubhouse and reworking the course
The 338-acre Lone Palm Golf Club off Lone Palm Drive is remodeling its clubhouse and seeking city approval for a course renovation master plan.
-
Under ConstructionCommercial
Treatt USA adds walkway and canopy at Lakeland Commerce Parkway facility
Building permits filed for a walkway and canopy addition at the Treatt USA facility on Lakeland Commerce Parkway.
-
Under ConstructionCivic & Health
The Cleveland Heights YMCA is getting a $3.5 million makeover
The YMCA of West Central Florida is renovating its Cleveland Heights Boulevard campus into the Bob Adams Family Community YMCA, with a fieldhouse, wellness center and refreshed pools.
-
Under ConstructionRetail & Dining
Highlands Plaza is filling up with Aldi, Ellianos, Planet Fitness and more
A retail center on Lakeland Highlands Road is being reworked with a new drive-through coffee shop, a grocery store, a gym and medical space.
-
Under ConstructionHousing
Pointe Grand Lakeland is building out its clubhouse and amenities off Patriot Drive
A residential community called Pointe Grand Lakeland is adding a pool, pickleball court, grill pergola and more on Patriot Drive.
-
Under ConstructionCommercial
A new Firestone auto care center is coming to Lakeland Highlands Road
A Firestone Complete Auto Care shop is being built at 3645 Lakeland Highlands Road.
-
Under ConstructionCivic & Health
First Presbyterian Church renovations underway at Lake Hollingsworth
The church at 175 Lake Hollingsworth Drive has pulled permits for a Scout building project and an interior renovation.
-
Under ConstructionCommercial
Lone Palm Golf Club is getting a top-to-bottom clubhouse makeover
The clubhouse at 800 Lone Palm Drive is working through a series of renovation permits — from a new entry canopy to a gutted third floor and kitchen.
-
Under ConstructionIndustrial
A warehouse tenant is fitting out space on New Tampa Highway
A large industrial building on New Tampa Highway is being reworked for a tenant, with records tied to Star Distribution.
-
Under ConstructionIndustrial
Bays fill in at Ruthven Business Park on Drane Field Road
A cluster of interior buildouts, drive-in ramps, and fire-system work is fitting out bays 19 through 23 at a business park off Drane Field Road.
-
Under ConstructionCivic & Health
Transit stop bench installed on George Jenkins Boulevard
A transit stop bench has been built at 1043 George Jenkins Boulevard.
-
Under ConstructionRetail & Dining
Buffalo Wild Wings Go is coming to the Harden Boulevard Publix center
A Buffalo Wild Wings Go take-out location has been built out in the Publix-anchored center at 3628 Harden Blvd in South Lakeland.
-
Under ConstructionRetail & Dining
Einstein Bros. Bagels is opening at Edgewood Plaza on South Florida Avenue
An Einstein Bros. Bagels is filling a restaurant space at Edgewood Plaza on South Florida Avenue in Lakeland.
-
Under ConstructionCommercial
Extra Space Storage on US 98 North gets a makeover, solar and a cell tower
A storage property at 4400 Highway 98 N is renovating its office and units, adding rooftop solar, and permitting a communications tower.
-
Under ConstructionRoads
US 17 (SR 555) pavement resurfacing underway from Transport Road to Avenue G
FDOT is resurfacing about three miles of US 17 (SR 555) through central Lakeland.
-
Under ConstructionRoads
Bike path coming to Tenoroc Trail from Lake Crago Drive to SR 33
FDOT is building a bike path along Tenoroc Trail's first segment, from Lake Crago Drive to SR 33 at Old Combee Road.
-
Under ConstructionRoads
Traffic signal work coming to US 98 at Lyle Parkway
FDOT is upgrading traffic signals at the intersection of US 98 and Lyle Parkway.
-
Under ConstructionCivic & Health
One More Child is reworking its Sikes Boulevard campus
A planned development for One More Child on Sikes Boulevard is moving forward, with old buildings coming down and site work underway.
-
Under ConstructionRetail & Dining
The old Mobil station on US 98 North is being rebuilt as a Kangaroo Express
A Mobil gas station on US 98 N was torn down and is being reworked into a Kangaroo Express, with new fuel tanks, a repaired canopy and fresh signs.
-
Under ConstructionCivic & Health
Orlando Health is building out its Lakeland Highlands hospital campus
Orlando Health is fitting out and signing a new hospital campus at 4000 Lakeland Highlands Road in south Lakeland.
-
Under ConstructionIndustrial
A warehouse and storage yard is taking shape on New Tampa Highway
Site work and building permits are moving on a warehouse and storage project at 3070 New Tampa Highway, owned by Lakeland Storage 1 LLC.
-
Under ConstructionRetail & Dining
Aldi is moving into the old Winn-Dixie on Socrum Loop Road
A former Winn-Dixie grocery store in North Lakeland is being retrofitted into an Aldi.
-
Under ConstructionCivic & Health
Lakeland is building a new electrical facility on Glendale Street
The City of Lakeland has permitted a new electrical building, backup generators and a fuel tank at 1825 Glendale Street.
-
Under ConstructionCivic & Health
Lakeland Linder Airport is filling in with new buildings, hangars and an Amazon lot
A steady run of permits on the city-owned airport parcel covers an Avelo village, a $2.6M aviation hangar, Amazon EV chargers and an admin remodel.
-
Under ConstructionRoads
I-4 through Lakeland is getting repaved from Galloway Road to SR 35
The state has a contractor lined up to resurface a stretch of Interstate 4 near Lakeland.
-
Under ConstructionRoads
State Road 37 is getting repaved from CR 640 up to Moses Street
A roughly 2.2-mile stretch of SR 37 is being resurfaced under a $1.8 million state contract.
-
Under ConstructionRoads
SR 655 resurfaced from Coleman Road to CR 542
A state road resurfacing project on SR 655 between Coleman Road and CR 542 has been completed.
-
Under ConstructionRoads
Sidewalk and median improvements coming to SR 600 corridor
FDOT is building sidewalks and modifying medians along US 17/92 between Hinson and Johnson avenues.
-
Under ConstructionRoads
Lakeland Hills Boulevard is getting rebuilt from Parkview to Granada
A roughly $19.4 million state project is reconstructing the pavement on SR 33 (Lakeland Hills Blvd) between Parkview Place and Granada Street.
-
Under ConstructionRoads
Countyline Road bridge over Peace River getting replaced
FDOT is replacing the Countyline Road bridge that crosses the Peace River.
-
Under ConstructionRoads
I-4 bridge over the CSX railroad is being rebuilt
FDOT is replacing the Interstate 4 bridge where it crosses the CSX railroad line, a roughly $33 million project now under construction.
-
Under ConstructionRoads
The I-4 and SR 33 interchange is being rebuilt with wider lanes and a wildlife crossing
FDOT is widening the I-4 interchange at State Road 33 and adding lanes along SR 33, with work already underway through 2029.
-
Under ConstructionRoads
SR 35 intersection at Colbert Road improved
FDOT completed an intersection improvement project on US 98 at Colbert Road.
-
Under ConstructionRoads
SR 540 intersection improvements near US 17 complete
FDOT finished intersection work on SR 540 between US 17 and east of 1st Street.
-
Under ConstructionRoads
US 98 is getting rebuilt from Griffin Road to Sharon Drive
The state is reconstructing the pavement on US 98 (SR 700/35) through this stretch of Lakeland, with work already underway.
-
Under ConstructionRoads
I-4 between Hillsborough County line and Galloway Road is being resurfaced
FDOT is resurfacing a stretch of I-4 from the Hillsborough County line to Galloway Road.
-
Under ConstructionRoads
A stretch of I-4 through Polk got a fresh surface
State crews resurfaced I-4 between SR 33 and CR 557 (Old Grade Road), a job now marked complete.
-
Under ConstructionRoads
State Road 17 getting new pavement between Waverly and Lake Trask
FDOT is resurfacing a 3.6-mile stretch of SR 17 from north of Waverly Road to south of Lake Trask Road.
-
Under ConstructionRoads
US 27 got repaved from SR 540 up past Kokomo Road
A roughly 5.4-mile stretch of US 27 (SR 25) north of SR 540 was resurfaced under a $22 million state contract.
-
Under ConstructionRoads
SR 540 resurfaced from Bartow Road to Polk Parkway
A state road resurfacing project on SR 540 between SR 35 and Polk Parkway has been completed.
-
Under ConstructionRoads
US 92 getting a new surface from Gary Road to Combee Road
FDOT is resurfacing a 2-mile stretch of US 92 (SR 546/SR 600) between Gary Road and Combee Road.
-
Under ConstructionRoads
State Road 60 resurfaced from CR 555 to Broadway Avenue
FDOT is resurfacing a 2.1-mile stretch of SR 60 through central Lakeland.
-
Under ConstructionRoads
SR 60 getting resurfaced between Dude Ranch and Rattlesnake roads
A 2.5-mile stretch of State Road 60 is being resurfaced.
-
Under ConstructionRoads
SR 600 (US 17) resurfacing between Frombuff Ave and South Blvd
A state road resurfacing project on US 17 in central Lakeland.
-
Under ConstructionRoads
US 98 is getting wider through North Lakeland from Socrum Loop toward CR 54
The state is adding lanes and rebuilding US 98 (SR 35) along the stretch from north of West Socrum Loop Road up toward CR 54.
-
Under ConstructionRoads
Three Parks Trail bike path extended from Cleveland Heights Blvd to Westover St
A bike path extension connecting Three Parks Trail westward is listed as completed in Florida's transportation work program.
-
Under ConstructionRoads
Bike path coming to Wabash Avenue between Ariana and Hickory
Florida Department of Transportation is building a bike path along Wabash Avenue from Ariana Street to Hickory Street.
Permitted 99
-
PermittedCivic & Health
St. Nectarios Orthodox Church building addition, Marcum Road
St. Nectarios Orthodox Church is adding a 5,000-square-foot building with new parking and expanded stormwater management.
-
PermittedIndustrial
Ronnie's Carpeting builds new storage building on US 98 North
Ronnie's Carpeting is replacing a storm-damaged storage building with a new masonry structure on N Highway 98.
-
PermittedCivic & Health
Gospel Village accessibility remodel on Lemon Street East
Three residential units at Gospel Village are being remodeled to add mobility features.
-
PermittedCommercial
Prima 135 renovation at 113 Tennessee Ave S
A commercial renovation is underway at 113 Tennessee Ave S.
-
PermittedCivic & Health
Heart of Father Ministry adding bathrooms and changing rooms at Bartow Road location
Heart of Father Ministry is adding two new bathrooms and changing rooms behind existing baby rooms at its HWY 98 S location.
-
PermittedCivic & Health
Polk County Fire Rescue Station under construction on CR 540A in Lakeland
Polk County is building a new fire rescue station on E Highway 540A in Lakeland.
-
PermittedCivic & Health
Transit stop bench coming to US 98 North
A transit stop bench is being built at 5100 Highway 98 North.
-
PermittedIndustrial
Graham Packaging is adding to its plant on County Line Road
A concrete pad and new fire sprinklers are going in at the Graham Packaging plant at 1070 County Line Road.
-
PermittedCommercial
Windows, doors, and garage doors coming to 904 Brookwood Dr
Windows, doors, and garage doors are being installed at a commercial building on Brookwood Dr.
-
PermittedCivic & Health
Cecil Gober Villas units 19–22 reconstruction at Florida Avenue North
Four units at the Lakeland Housing Authority's Cecil Gober Villas are undergoing reconstruction.
-
PermittedCivic & Health
Transit stop bench coming to 5135 US 98 North
A transit stop bench is permitted at 5135 Highway 98 North.
-
PermittedCivic & Health
Transit Stop Bench Coming to US 98 North
A transit stop bench has been permitted on Highway 98 North.
-
PermittedCivic & Health
Transit Stop Bench Coming to 717 Florida Ave N
A transit stop bench is coming to 717 Florida Ave N.
-
PermittedCivic & Health
Transit stop bench coming to George Jenkins Boulevard
Lakeland is installing a transit stop bench at 1841 George Jenkins Boulevard.
-
PermittedCivic & Health
Transit stop bench coming to US 98 North
A transit stop bench is being built at 4200 Highway 98 North.
-
PermittedCivic & Health
Transit Stop Bench at 4400 South Florida Avenue
A transit stop shelter is being installed at 4400 Florida Ave S.
-
PermittedCivic & Health
Transit stop bench installed on US 98 North
A transit stop bench with shelter has been permitted on Highway 98 North.
-
PermittedCivic & Health
Lumikids pediatric care center is coming to Parker Street in Lakeland
City records point to Lumikids, a pediatric medical daycare, moving into 912 Parker Street E near Memorial Boulevard.
-
PermittedCommercial
Low-voltage electrical work at 3700 US 98 North
An electrical contractor has received a permit for low-voltage work at 3700 Highway 98 N.
-
PermittedCivic & Health
Transit stop bench coming to South Florida Avenue
Lakeland is installing a transit stop bench at 2645 Florida Ave S.
-
PermittedCivic & Health
Transit stop bench coming to Providence Road
A transit stop bench is permitted for 2706 Providence Road.
-
PermittedCivic & Health
Transit stop bench coming to 303 Massachusetts Ave N
A transit stop bench is being built at 303 Massachusetts Ave N.
-
PermittedCivic & Health
Transit stop bench coming to New Tampa Highway
A transit stop bench is being built at 3801 New Tampa Highway.
-
PermittedCivic & Health
Harvest Assembly of God building sanctuary and classrooms on Airport Road
Harvest Assembly of God is building a new sanctuary and classroom building at 2130 Airport Road.
-
PermittedCivic & Health
Transit stop bench at 1249 Sikes Boulevard
A transit stop bench is being installed at 1249 Sikes Boulevard.
-
PermittedCivic & Health
Transit Stop Bench coming to US 98 North
Lakeland has permitted a transit stop bench at 2620 Highway 98 North.
-
PermittedCivic & Health
Transit stop bench permitted at 3000 Harden Boulevard
A transit stop bench has been permitted at 3000 Harden Blvd.
-
PermittedCivic & Health
A rebuilt clubhouse at the Josephine Street community off Hickory Hills
The property owned by Florida Hickory Hills Ltd has rebuilt its clubhouse, with electrical and fire-protection work wrapping up.
-
PermittedCivic & Health
St. Mark United Methodist Church getting roof, windows, and new signage
St. Mark United Methodist Church at 1640 Martin L King Jr Ave is undergoing building updates.
-
PermittedCommercial
Interior Remodel and Roof Work at 215 East Main Street
An interior remodel and new roof are underway at 215 Main Street East in downtown Lakeland.
-
PermittedCommercial
Windows retrofit at 771 Carpenters Way
A windows and doors replacement at 771 Carpenters Way has been permitted.
-
PermittedCivic & Health
Transit stop benches coming to Harden Boulevard
Two bus shelter benches permitted at 1927 Harden Boulevard.
-
PermittedCivic & Health
Transit stop bench permitted at Edgewood Plaza
A transit stop bench is coming to 1985 Edgewood Drive East.
-
PermittedHousing
Triplex coming to 849 Lime St E
Hulbert Homes is building a three-unit residential structure in historic downtown Lakeland.
-
PermittedCommercial
Verizon wireless upgrades antenna and power systems at 2821 West Pipkin Road
Verizon wireless is replacing antennas and adding backup power at an existing tower on Pipkin Road.
-
PermittedCommercial
Falcon Professional Center unit gets AC replacement and electrical work
Mechanical and electrical upgrades finalized at a commercial tenant space on Florida Avenue South.
-
PermittedCivic & Health
The King's Church puts up its sign at 1736 New Jersey Road
A wall sign, new AC units, a walkway cover and fire-alarm work point to The King's Church settling into the Geneva Classical Academy property.
-
PermittedCommercial
Cell tower on Parkway Frontage Road gets an upgrade
Crews are modernizing an existing cell tower off Parkway Frontage Road North, adding a backup generator and fuel tank.
-
PermittedRetail & Dining
Sam's Club on US 98 North is upgrading its refrigeration
The Sam's Club at 4600 Highway 98 North is getting new coolers and refrigeration, with building and fire-system permits now issued.
-
PermittedCommercial
Waller Plaza on South Florida Avenue gets a facade and sign refresh
A downtown-area commercial building owned by Waller Development is getting exterior work and new signs, with a city grant helping fund it.
-
PermittedCommercial
A pickleball facility is taking shape at 905 Rose Street
Plans for the Baseline Pickleball Facility are complete, a city grant has been awarded, and a new roof is going on the building at 905 Rose Street East.
-
PermittedCivic & Health
Family Worship Center interior seating modified at 1330 Rose Street East
Interior seating remodel permitted and completed at Family Worship Center.
-
PermittedCommercial
A new tenant fits out two bays at Gateway Business Park off County Line Road
Two bays at 3150 County Line Road were built out for a commercial tenant, with the work now complete.
-
PermittedRetail & Dining
Viste coming to Lake Parker Avenue
A new tenant is moving into 621 Lake Parker Avenue North with an interior renovation underway.
-
PermittedRetail & Dining
RejuvaNu Medspa and Wellness opening at 208 Lake Ave S
A medspa and wellness business is opening in downtown Lakeland with a small remodel and new ground sign.
-
PermittedCommercial
Regal Kia expanding at Highway 98 location
Regal Kia is undertaking a Phase 2 expansion at its Highway 98 S dealership.
-
PermittedIndustrial
A six-bay warehouse is finished on Pipkin Road in South Lakeland
A new shell warehouse at 3929 Pipkin Road S has had six tenant bays built out, with fire systems and trash enclosures now complete.
-
PermittedRetail & Dining
Barnes & Noble and Lucky Goat Coffee built out at 3615 South Florida Avenue
Two tenants finished their build-outs in the Kimco-owned shopping center on South Florida Avenue — a Barnes & Noble bookstore and a Lucky Goat Coffee cafe.
-
PermittedCommercial
Orangetheory Fitness is fitting out space on South Florida Avenue
A $300,000 commercial remodel permit names Orangetheory Fitness as a tenant at 1065 Florida Avenue South.
-
PermittedRetail & Dining
Skechers is fitting out a storefront at Village Plaza on US 98 North
A Skechers shoe store is taking a spot at the Village Plaza shopping center on Highway 98 North.
-
PermittedRetail & Dining
A restaurant on South Florida Avenue got a top-to-bottom remodel
An existing restaurant at 4515 Florida Ave S was remodeled inside and out, with a new pole sign, building sign, and roughly $750,000 in interior work.
-
PermittedRetail & Dining
Hibbett Sports moves into Grove Park Center on Bartow Road
A Hibbett Sports store has been built out at the Publix-anchored Grove Park Center, with new tenant signage still going up along South Florida Avenue.
-
PermittedHousing
Lakewood Terrace Apartments is getting a full renovation on 14th Street West
Every unit and building at the Lakewood Terrace apartment complex is being renovated, with permits now issued.
-
PermittedHousing
Twin Lakes Phase III brings 92 new apartments to Webster Avenue
The Lakeland Housing Authority is building two three-story apartment buildings with 92 units on Webster Avenue South.
-
PermittedCivic & Health
Fire Sprinkler System Installed at 100 Kentucky Avenue South
Fire sprinkler system permitted for Suite 250 at 100 Kentucky Avenue South.
-
PermittedIndustrial
Metal hangar planned at Lakeland Linder Airport
A metal building hangar is being constructed at 3919 Aero Pl near Lakeland Linder Airport.
-
PermittedCommercial
Pops Industrial Coatings updates pole sign at Drane Field location
A pole sign at 3805 Drane Field Rd received new faces.
-
PermittedCivic & Health
Transit stop bench coming to George Jenkins Boulevard
A bus shelter is permitted at 1203 George Jenkins Boulevard.
-
PermittedCommercial
Electrical work underway at 3850 Old Tampa Hwy
Commercial electrical permits issued for compressor and branch circuits at 3850 Old Tampa Hwy.
-
PermittedCommercial
Fire suppression system permitted at 815 W Daughtery Road
A commercial fire suppression system is being installed at 815 W Daughtery Road.
-
PermittedRetail & Dining
Publix roof recover at Socrum Loop Road
A commercial roof replacement at the Publix on Socrum Loop Road North.
-
PermittedCommercial
Building work underway at Highland Fairways Boulevard
Commercial renovation at 3222 Highland Fairways Boulevard has been permitted and completed.
-
PermittedCivic & Health
Transit stop bench coming to 1600 George Jenkins Boulevard
A bus shelter is permitted at 1600 George Jenkins Blvd.
-
PermittedCivic & Health
Lakeland Regional's Hollis Cancer Center gets a new radiation machine and fresh signs
Lakeland Regional Health replaced a linear accelerator and reworked the pylon and cabinet signs at its Hollis Cancer Center on Lakeland Hills Boulevard.
-
PermittedCommercial
A spec suite gets built out at 5370 Allen K Breed Highway
Crews finished an interior buildout of a commercial suite in South Lakeland, though no tenant is named yet in the records.
-
PermittedCommercial
Interior remodel permitted at 1145 Lakeland Hills Boulevard
A commercial building interior remodel is underway at 1145 Lakeland Hills Boulevard.
-
PermittedCommercial
Methane detection system installed at 1314 George Jenkins
A methane detection system has been permitted and finaled at a commercial building on George Jenkins Boulevard.
-
PermittedCivic & Health
The Way Community Church removes wall at Commerce Point location
A permitted remodel project at the church's Commerce Point Drive building.
-
PermittedCivic & Health
Bus shelter coming to Lakeland Hills Boulevard
The city has issued a permit for a new bus stop shelter on Lakeland Hills Boulevard.
-
PermittedRetail & Dining
Waffle House on Lakeland Hills Boulevard undergoes 20-year remodel
A Waffle House location at 4210 Lakeland Hills Boulevard has completed a major remodel.
-
PermittedCommercial
Dumpster Enclosure Permitted at 5301 Socrum Loop Road
A dumpster enclosure has been permitted at 5301 Socrum Loop Rd N.
-
PermittedCivic & Health
Transit stop bench coming to George Jenkins Boulevard
Lakeland has issued a permit for a transit stop bench at 1605 George Jenkins Boulevard.
-
PermittedIndustrial
Publix upgrades its deli plant and warehouse buildings on New Tampa Highway
Publix is reroofing warehouse and maintenance buildings and adding fire and life-safety systems across its Lakeland deli plant campus.
-
PermittedIndustrial
Monster Energy builds out a facility on Allen K Breed Highway
A run of building permits shows a Monster Energy operation taking shape at 5380 Allen K Breed Highway, with an interior buildout, two guardhouses, battery chargers and a new fence.
-
PermittedIndustrial
Warehouse space at Commerce Point Drive getting new tenant fit-out
A 33,600-square-foot commercial space at 2345 Commerce Point Drive is undergoing interior renovation and equipment installation.
-
PermittedRetail & Dining
Makers Market and Farmacy opens at Cleveland Heights plaza
A market and farm-focused business has completed renovation work at a Cleveland Heights commercial space.
-
PermittedRetail & Dining
7-Eleven expands at Bridgewater Center
An existing 7-Eleven convenience store at Bridgewater Center has completed a renovation and expansion.
-
PermittedIndustrial
Tranzmotion sets up shop on Drane Field Road
A commercial space near Lakeland Linder has been fitted out with warehouse racking, a loading ramp, and a new Tranzmotion sign.
-
PermittedCommercial
City renovating commercial building at Aircraft Drive
Lakeland is upgrading a commercial building with roof replacement and mechanical work.
-
PermittedCivic & Health
Transit Stop Bench Installed at Socrum Loop Road
A transit stop bench has been permitted at 4420 Socrum Loop Rd N.
-
PermittedCivic & Health
Transit stop bench installed at Lakeland Hills Boulevard
A bus shelter bench has been permitted and finalized at 4255 Lakeland Hills Boulevard.
-
PermittedCivic & Health
Bus shelter coming to Parkway Frontage Road North
A bus shelter is being installed at 1033 Parkway Frontage Road North.
-
PermittedCivic & Health
Youkey Theater at the RP Funding Center is getting a new roof
The city pulled a $1.5 million permit to replace the roof over Youkey Theater at Lakeland's RP Funding Center.
-
PermittedCivic & Health
Central Florida Health Care opens outpatient medical facility on Missouri Avenue
A new outpatient medical modular building is under construction at 1129 Missouri Avenue North.
-
PermittedCommercial
Communications tower gets upgraded at Lakeland airport
MGM Corporation of Lakeland is modifying a communications tower at 3604 Ventura Drive East with roof work, a backup generator, and electrical upgrades.
-
PermittedCommercial
Three-building Interstate Business Center is cleared to build off Interstate Drive
Building permits are in hand for a three-building commercial business center on Interstate Drive in north Lakeland.
-
PermittedCommercial
Conditional Use Permit approved at 1512 Gary Road E
A conditional use permit has been approved for 1512 Gary Road E, with roof and signage work underway.
-
PermittedCivic & Health
Lakeland Area Mass Transit District parking area gets restored at George Jenkins Boulevard
The Lakeland Area Mass Transit District is restoring its parking area at 1212 George Jenkins Boulevard.
-
PermittedIndustrial
Industrial buildout and a rezoning move ahead along Drane Field Road
A commercial interior buildout at 4590 Drane Field Road has been permitted while nearby owners seek an industrial rezoning and update stormwater plans for a distribution site.
-
PermittedRetail & Dining
A downtown space at 202 Massachusetts Avenue gets built out
A commercial space in downtown Lakeland has been remodeled and built out, backed by a CRA grant.
-
PermittedCivic & Health
Bonnet Springs Park is expanding its museum parking
A 2.6-acre parking expansion for the museum at Bonnet Springs Park has been approved and cleared to start site work.
-
PermittedCommercial
An HVAC swap at 1011 South Florida Avenue
A commercial air-conditioning changeout was permitted at 1011 Florida Avenue South in the Dixieland area.
-
PermittedRoads
Bike path built on Edgewood Drive North from US 98 to 9th Street
A bike path on Edgewood Drive North between US 98 and 9th Street NE has been completed.
-
PermittedRoads
SR 517 resurfacing between SR 600 and SR 546 completed
A state road resurfacing project on SR 517 (US 92) has been finished.
-
PermittedCommercial
GMF Steel Group signage going up at 4600 Drane Field Road
Sign permits issued for GMF Steel Group at an industrial property on Drane Field Road.
-
PermittedIndustrial
Publix warehouse and return center is moving ahead on County Line Road
Site work is cleared to begin on Publix's warehouse and return center at 2600 County Line Road.
-
PermittedIndustrial
Publix is bringing a warehouse and return center to County Line Road
Publix has pulled a $23.5 million site-work permit for a warehouse and return center on County Line Road.
-
PermittedRetail & Dining
City Limits Dance Hall is coming to US 98 North
A wall sign for "City Limits Dance Hall" is permitted at 4951 US 98 North.
-
PermittedIndustrial
A “Publix Fresh Kitchen” is coming together on New Tampa Highway
Fire-system permits describe a "Publix Fresh Kitchen" at Publix-owned property on New Tampa Highway.
Approved 18
-
ApprovedCommercial
Cornelius Welding is building a new office on Exploration Avenue
Cornelius Welding Inc. plans a steel office building of about 5,890 square feet with parking at 4650 Exploration Avenue in Lakeland.
-
ApprovedCommercial
Concept plan approved for 1212 Hallam Drive
Lakeland has approved a concept plan for a development at 1212 Hallam Drive.
-
ApprovedCommercial
Mixed-use development coming to Oakbridge Parkway and Harden Boulevard
A mixed-use planned unit development has been approved for the corner of Oakbridge Parkway and Harden Boulevard.
-
ApprovedRetail & Dining
Magic Wok of Lin planned at 2153 CR 540A, Lakeland
Magic Wok of Lin is planned at 2153 E County Rd 540A in Lakeland: a new food-service business with seating, according to a kitchen plan-review application filed with the State of Florida.
-
ApprovedRetail & Dining
Wingstop planned at 7368 Kathleen Road, Lakeland
Wingstop is planned at 7368 Kathleen Rd in Lakeland: a new food-service business with seating, according to a kitchen plan-review application filed with the State of Florida.
-
ApprovedIndustrial
540A Self Storage gets one more year to break ground
An approved self-storage facility on CR 540A has won a one-year extension.
-
ApprovedCivic & Health
Watermain extension approved for Airside Center area
City has approved a site plan for a watermain extension in the Airside Center area.
-
ApprovedCivic & Health
Believers Fellowship to relocate to Socrum Loop North
A church concept plan has been approved for 5240 Socrum Loop Road North.
-
ApprovedCommercial
Business incentive awarded for work at 339 Bartow Road
Lakeland's Community Redevelopment Agency has awarded an incentive for improvements at 339 Highway 98 South.
-
ApprovedRoads
New bridge planned for Grandview Parkway between Posner Boulevard and Dunson Road
Florida Department of Transportation plans to build a new bridge on Grandview Parkway north of Posner Boulevard.
-
ApprovedCommercial
Planned Unit Development modification approved at 3602 DMG Drive
A planned unit development modification at 3602 DMG Drive has been approved.
-
ApprovedCommercial
Wedgewood Redevelopment planned at 401 Carpenters Way
A planned unit development for the Wedgewood Redevelopment at 401 Carpenters Way has been approved.
-
ApprovedCommercial
Tesla Lakeland prepares site on US 98 North
Tesla Lakeland is preparing its 5.8-acre site on Highway 98 North with environmental permits approved.
-
ApprovedCommercial
Land near Shimmering Drive cleared for a Community Activity Center
Polk County approved a future land use change on about 3.87 acres, shifting it from low-density residential to a Community Activity Center with a specific activity center plan.
-
ApprovedCommercial
Land near State Road 540A cleared to switch from homes to office use
Polk County commissioners approved a small map change letting a 1.35-acre parcel along State Road 540A be used for offices instead of suburban housing.
-
ApprovedCommercial
A 1.13-acre corner near Kathleen and Duff wins adoption vote
On Feb 17, 2026, county commissioners approved the plan amendment at its adoption hearing.
-
ApprovedIndustrial
GrayLineX industrial land-use change wins adoption vote
On Jul 21, 2026, county commissioners approved the plan amendment at its adoption hearing.
-
ApprovedCommercial
Shimmering Drive commercial corner wins adoption vote
On Jul 21, 2026, county commissioners approved the plan amendment at its adoption hearing.
In Review 72
-
In ReviewIndustrial
Stronghold Development builds storage warehouse on Lasso Lane
A 7,500-square-foot storage warehouse is coming to Lasso Lane.
-
In ReviewIndustrial
Industrial outdoor storage planned at 3306 Waterfield Road
A new owner plans to lease a 19,125-square-foot industrial building and adjacent land on Waterfield Road for outdoor storage, possibly paving part of the grassy area.
-
In ReviewCommercial
Business park planned for Fish Hatchery Road
A business park is proposed for Fish Hatchery Road.
-
In ReviewCommercial
Medical office planned for 5955 South Florida Avenue
A medical office building is planned for 5955 S Florida Ave.
-
In ReviewRetail & Dining
Ay Que Rico Cuban restaurant opening at East County Road 542
Ay Que Rico, a Cuban restaurant from Brandon, is renovating a space on East County Road 542 to open a second location.
-
In ReviewIndustrial
Barnes Electric commercial warehouse planned on US 98 North
Barnes Electric is proposing a commercial warehouse on 8.73 acres on the eastern side of US 98 North.
-
In ReviewRetail & Dining
Four Smokes BBQ Lakeland filed kitchen plans for 995 East Memorial Boulevard, Lakeland
Four Smokes BBQ Lakeland has applied to the State of Florida for a kitchen plan review at 995 E Memorial Blvd in Lakeland: a food-service kitchen with seating. The state has not yet recorded whether the application is for new construction or a remodel.
-
In ReviewIndustrial
TCI Logistics warehouse coming to New Tampa Highway
A 7,500 square foot light industrial warehouse is planned for 6210 New Tampa Highway.
-
In ReviewIndustrial
Triple E Management wants to shift land on East Main Street toward industrial use
A request to change two parcels at 3640 E Hwy 542 from residential to a business-park designation, with conditions limiting the intensity of industrial activity.
-
In ReviewRetail & Dining
Auto dealership coming to US 92, Lakeland
A single-story auto dealership with showroom, offices, and attached service garage is planned for 2411 East Highway 92.
-
In ReviewCivic & Health
India Pentecostal Church planning fellowship hall and lobby renovation
India Pentecostal Church is planning an 8,320-square-foot fellowship hall addition and renovation of the existing lobby and restrooms.
-
In ReviewCivic & Health
Lakeland Regional Health expanding cancer center on South Florida Avenue
Lakeland Regional Health is renovating its Hollis Cancer Center on South Florida Avenue, with site work including new HVAC equipment, a generator, and updated signage.
-
In ReviewRetail & Dining
Island Taste Budz filed kitchen plans for 116 S Tennessee Ave, Lakeland
Island Taste Budz has applied to the State of Florida for a kitchen plan review at 116 S Tennessee Ave in Lakeland: a food-service kitchen with seating. The state has not yet recorded whether the application is for new construction or a remodel.
-
In ReviewCommercial
Lakeland Park Center is moving forward at Lakeland Park Center Drive
A development called Lakeland Park Center is in site-plan review on Lakeland Park Center Drive.
-
In ReviewCivic & Health
Esperanza City Church remodeling at 635 Wabash Ave N
Esperanza City Church is remodeling its building at 635 Wabash Ave N.
-
In ReviewRetail & Dining
Sam's Club on US-98 North is upgrading its coolers and has a new site plan under review
The Sam's Club at 4600 US-98 North in Lakeland has been reworking its refrigeration and fire systems while a concept plan for the site moves through city review.
-
In ReviewRetail & Dining
Nick & Moes restaurant planned for US 92
A restaurant concept plan for Nick & Moes is under review at 2020 Highway 92 East.
-
In ReviewCommercial
Kingsky Flight Academy is building a new hangar at Lakeland Linder
A site plan and state permits are moving for a Kingsky Flight Academy hangar at Lakeland Linder International Airport.
-
In ReviewCommercial
My Place Hotel planned for Great Oak Drive
A My Place Hotel is proposed for 5360 Great Oak Drive.
-
In ReviewCommercial
Office building planned for 1215 West Memorial Boulevard
An office development is being planned at 1215 Memorial Blvd W, with one concept plan approved and others withdrawn.
-
In ReviewCivic & Health
Emerald Arts Academy is taking shape at 235 Florida Avenue North
A historic downtown Lakeland building is being prepared for Emerald Arts Academy, with a CRA grant awarded and exterior work approved.
-
In ReviewCivic & Health
Lakeland Christian School plans new and renovated athletic fields
Lakeland Christian School has a site plan under review to add and renovate its south athletic fields on Forest Park Street.
-
In ReviewIndustrial
Industrial rezoning sought for 25 acres on Airport Road
The Woods family is asking Lakeland to rezone about 25 acres on Airport Road to allow medium-industrial and limited light-industrial uses.
-
In ReviewIndustrial
Warehouse planned for Gateway Boulevard
A warehouse is moving through Lakeland's approval process on Gateway Boulevard.
-
In ReviewCivic & Health
Cannon Funeral Home seeking zoning change at 315 West Memorial Boulevard
A funeral home operator is seeking rezoning and concept plan approval for a property on Memorial Boulevard.
-
In ReviewIndustrial
Business park at Bartow Road to allow light industrial and wholesale
The owners of a business park at 1200 Highway 98 South are seeking to modify its zoning to permit light industrial and wholesale trade uses alongside existing office and commercial space.
-
In ReviewIndustrial
A Pipkin Creek office site could add wholesale and light-industrial uses
Owners of a Planned Unit Development at 4155 Pipkin Creek Road want to allow wholesale trade and light-industrial service uses alongside the office uses already approved there.
-
In ReviewRetail & Dining
Comedy Cathedral coming to Massachusetts Avenue
An entertainment venue is planned for 417 Massachusetts Avenue North.
-
In ReviewIndustrial
Logistics Center Planned for 923 Wilkinson Road
A concept plan for a logistics center is under review at 923 Wilkinson Road.
-
In ReviewCommercial
RATEC seeks to develop commercial site on Bella Vista
RATEC America Corp has submitted plans for a 5.7-acre commercial development at 1970 Bella Vista Street West.
-
In ReviewRetail & Dining
Baywood AC Hotel Lakeside subdivision planned at Town Center Drive
A commercial subdivision plat for a hotel and shopping plaza is under review at 1400 Town Center Drive.
-
In ReviewCommercial
My Place Hotel planned for Great Oak Drive
A My Place Hotel is planned for 5352 Great Oak Drive in Lakeland.
-
In ReviewHousing
122 Bluefield Avenue concept plan moves forward
A concept plan for 122 Bluefield Apartments has been completed.
-
In ReviewRetail & Dining
Airport Road Plaza planned at 2850 Airport Road
Site plan under review for Airport Road Plaza at 2850 Airport Road.
-
In ReviewHousing
15-unit apartment complex planned for Plateau Avenue
A 15-unit multifamily development proposed at 707 Plateau Avenue.
-
In ReviewCommercial
An office park is proposed on Fitzgerald Road in South Lakeland
A rezoning filing would clear the way for business office buildings on two parcels off Fitzgerald Road.
-
In ReviewIndustrial
Peachtree Mobile Home and RV Park undergoes layout revision
MHP Operations LLC is modifying the existing Peachtree Mobile Home & RV Park, connecting to City sewer and consolidating its two entrances into one.
-
In ReviewRoads
Pedestrian Safety Improvements Proposed at Airport Road and Don Emerson Drive
The city is reviewing a concept plan for pedestrian safety work at Airport Road and Don Emerson Drive near Lakeland Linder International Airport.
-
In ReviewCivic & Health
Lakeland Regional Health System installing underground fire suppression line at North Lakeland facility
Underground fire suppression infrastructure is being added at Lakeland Regional Health System's North Lakeland location.
-
In ReviewCommercial
A funeral and cremation business is proposed on Drane Field Road
Plans call for a funeral and cremation enterprise on a long, narrow lot at 4930 Drane Field Road in Lakeland.
-
In ReviewCommercial
MJW Consolidated planning office expansion at Drane Field Road
MJW Consolidated is planning an office expansion at 4419 Drane Field Road.
-
In ReviewIndustrial
A return center is proposed on Allen K Breed Highway
A planned unit development described as a return center is under review at 5340 Allen K Breed Hwy in Lakeland.
-
In ReviewCivic & Health
All Creatures Lakeland expands parking and renovates stormwater pond
Site plan filed for parking lot expansion and stormwater improvements at the existing veterinary clinic.
-
In ReviewCommercial
Publix seeks sidewalk waiver for Allen K. Breed redevelopment
Publix has requested a waiver from Polk County sidewalk requirements along Allen K. Breed for its Lakeland Industrial Complex West redevelopment.
-
In ReviewIndustrial
Southern Milling PUD planned for George Jenkins Boulevard
A planned unit development concept has been completed for the Southern Milling site on George Jenkins Boulevard.
-
In ReviewHousing
227-unit apartment complex proposed for S Westgate Avenue
A seven-building apartment development with 227 units is under review for a site off S Westgate Avenue near Ariana Street.
-
In ReviewIndustrial
Research and Development Laboratory Coming to Kidron Road
A research and development facility of an industrial nature is proposed for 4020 Kidron Road.
-
In ReviewRetail & Dining
Laundromat and retail coming to Sharon Drive
A laundromat and retail space is planned for 1050 Sharon Drive.
-
In ReviewCivic & Health
Magnolia Montessori plans parking and garden expansion at Oakhill Street
A concept plan for additional parking and garden space at Magnolia Montessori's Oakhill Street location.
-
In ReviewRetail & Dining
Golconda Convenience Store planned for East Memorial Boulevard
A convenience store is in review at 1325 Memorial Boulevard East.
-
In ReviewHousing
Morgan Ave Apartments moving forward at 608 N Morgan
Gregory Ashey's concept plan for Morgan Ave Apartments at 608 N Morgan Ave has been completed.
-
In ReviewCommercial
A drone-charging station is proposed at Lakeland Square Mall
A concept plan for a "Zipline Drone Charger" is under review at Lakeland Square Mall, alongside a steady run of store buildouts.
-
In ReviewCommercial
Lone Palm Golf Course planning a renovation master plan
A renovation master plan is in the works for Lone Palm Golf Course on Lone Palm Drive.
-
In ReviewIndustrial
Peachtree Mobile Home & RV Park to connect to Lakeland sewer, relocate spaces
The existing 30-space Peachtree Mobile Home & RV Park on E. Peachtree Street seeks approval to relocate and reconfigure spaces while connecting to city sewer service.
-
In ReviewIndustrial
Industrial rezoning proposed for Airport Road land
Owners want to rezone about 25 acres on Airport Road to allow medium and light industrial uses.
-
In ReviewCommercial
Sunbelt Rentals is setting up on West Memorial Boulevard
An equipment rental site plan is under review at 2805 Memorial Blvd W, with gate and garage-door work already done.
-
In ReviewIndustrial
Business park on Bartow Road seeks to allow light industrial uses
A 21.89-acre business park at 1200 Highway 98 South is seeking approval to add light industrial and wholesale trade uses to its existing office and commercial entitlements.
-
In ReviewCommercial
Medical office and bank branch planned for Oakbridge Parkway site
A 4,200 sq. ft. medical office and 3,000 sq. ft. retail bank with drive-through are proposed to replace previous commercial plans at 1200 Oakbridge Parkway.
-
In ReviewCommercial
Something is being planned at 1800 Harden Boulevard
A concept plan has moved through the city for a property on Harden Boulevard, but the records don't yet say what's proposed.
-
In ReviewCivic & Health
Lakeland Regional Health is planning a new endoscopy building on its Lakeland Hills campus
Lakeland Regional Health has filed plans for a new endoscopy building at 1330 Lakeland Hills Blvd while renovating its main hospital next door.
-
In ReviewCommercial
World Electric Supply expanding at Allen K Breed Highway
An electrical supply company is developing office and warehouse space in Lakeland.
-
In ReviewCommercial
Lakeland Hoop House planned for South Pipkin Road
A concept plan for Lakeland Hoop House at 4298 Pipkin Road South is in the approval process.
-
In ReviewRetail & Dining
Cava and Wild Fork coming to Florida and Imperial
Two restaurant brands are planned for the former restaurant site at Florida Avenue South and Imperial Avenue.
-
In ReviewCommercial
Covenant Group plans 5,600-square-foot mixed-use building on South Florida Avenue
A developer is proposing a roughly 5,600-square-foot building at Florida Avenue South and Shepherd Road, with space for PDS and another tenant.
-
In ReviewCommercial
Medical office planned for South Florida Avenue redevelopment
A rezoning application aims to clear the way for medical office use at 5955 S Florida Ave.
-
In ReviewCommercial
Triple E Management seeks zoning change on East Main Street
A rezoning request for property on East Main Street in Lakeland is under review.
-
In ReviewRoads
US 27 median work coming to George Street through Charles Street stretch
Florida Department of Transportation plans median modification and pavement resurfacing on US 27 between George and Charles streets.
-
In ReviewRoads
SR 563 median work at Pear and Parker Streets
FDOT is planning a median modification on SR 563 where Pear and Parker Streets intersect.
-
In ReviewRoads
SR 60 will be elevated over CSX Railroad tracks
FDOT is planning a grade separation project where State Road 60 will cross CSX Railroad tracks at a different elevation.
-
In ReviewRetail & Dining
Posh Salon Suite planned for Lakeland Highlands Road
A salon suite project on Lakeland Highlands Road is undergoing plan revisions after significant changes were added to the original proposal.
-
In ReviewCommercial
Atlas Auto Solutions plans site development on East Main
A site plan has been filed for Atlas Auto Solutions at 2501 E Main St.
-
In ReviewCommercial
A commercial land-use change is proposed along Socrum Loop West
A 1.49-acre parcel on Socrum Loop West could shift from low-density residential to a commercial corridor designation.
Proposed 18
-
ProposedRetail & Dining
A drive-through restaurant could join the Marathon gas station on Pipkin Road
An early inquiry asks Polk County about adding a drive-through restaurant to the Marathon gas and convenience store at 933 W Pipkin Road.
-
ProposedCommercial
A commercial project is taking shape at Kathleen and Prine
A concept plan for commercial development has been filed at 3252 Kathleen Road, near the corner of Prine Road.
-
ProposedHousing
Westside Garden Apartments planned for Ralston Road
A concept plan for Westside Garden Apartments has been completed at 5355 Ralston Road.
-
ProposedCommercial
Sign permit filed at 1523 South Combee Road
A commercial sign permit has been filed for 1523 S Combee Rd in Lakeland.
-
ProposedRoads
Bike path planned for Lakeshore Drive between Parker and Bon Aire
A new bike path is planned for Lakeshore Drive from East Parker Street to Bon Aire Street.
-
ProposedCommercial
Fire sprinkler system planned at 1325 North Combee Road
A commercial fire suppression system permit has been filed for 1325 N Combee Rd.
-
ProposedRetail & Dining
Nick & Moe's convenience store and fuel stop coming to US 92
A 4,052-square-foot convenience store with six dual-sided fuel pumps is proposed for 2.37 acres on East US Highway 92.
-
ProposedCivic & Health
A childcare center is proposed on South Florida Avenue in south Lakeland
Plans call for a 12,000-square-foot childcare center on a two-parcel site at 6765 S. Florida Ave.
-
ProposedIndustrial
Lakeland HMA plant expanding asphalt cement production
Hot-mix asphalt producer adding three 30,000-gallon tanks and new control room at Reynolds Road facility.
-
ProposedCivic & Health
Transit stop bench planned for Drane Field Road
A bus shelter permit was filed and then withdrawn at 3033 Drane Field Road.
-
ProposedCivic & Health
Adult day services concept plan withdrawn at Commercial Park Drive
A concept plan for New Hope Adult Day Services at 1517 Commercial Park Drive has been withdrawn.
-
ProposedIndustrial
Gateway Warehouse site plan withdrawn at 5301 Gateway Blvd
A proposed warehouse project on Gateway Boulevard has been withdrawn from City review.
-
ProposedHousing
Multifamily housing planned for West Pipkin Road
A concept plan for multifamily housing has been completed at 5015 Pipkin Road West.
-
ProposedRoads
Glendale Street Trail bike path to span from New Jersey Road to Lakeland Highlands Road
A roughly half-mile bike path along Glendale Street is in the state's five-year work program.
-
ProposedRetail & Dining
Vape store proposed for South Combee Road
A vape shop is being considered for 1523 S Combee Rd.
-
ProposedRoads
Chase Street Trail bike path coming from Strain Boulevard to W. O'Veterans Avenue
Florida Department of Transportation is building a bike path/trail along Chase Street between Strain Boulevard and W. O'Veterans Avenue.
-
ProposedRoads
Bike path coming to Lake Howard Drive corridor
Florida Department of Transportation has a bike path project planned for Lake Howard Drive from Avenue D SW to 15th Street SW.
-
ProposedRoads
State Road 544 could get more lanes between MLK Boulevard and Avenue Y
FDOT has this stretch of SR 544 (Lucerne Park) slated for added lanes and reconstruction in the coming years.
Complete 30
-
CompleteIndustrial
Three industrial buildings coming to County Line Road
Three industrial buildings with parking and stormwater infrastructure are planned for County Line Road near Lakeland.
-
CompleteIndustrial
Hamilton Logistics #140 tenant buildout on Hamilton Road
A 317,746-square-foot industrial building on Hamilton Road has completed its tenant buildout, with zoning approval for outdoor storage.
-
CompleteCommercial
Building Maintenance at 615 Alicia Road
Windows, doors, and roof maintenance work completed at a commercial building on Alicia Road.
-
CompleteCivic & Health
Transit shelter bench installed on US 98 North
A transit shelter bench has been installed on Highway 98 North.
-
CompleteCivic & Health
Peace River Center reroofs buildings on Williamsburg Square
Peace River Center for Personal Development has completed roof replacements on its office building and detached garage at 1664 Williamsburg Square.
-
CompleteCommercial
Metal storage building completed at 712 Gary Rd N
A 20-by-20-foot metal accessory building with concrete foundation has been completed at 712 Gary Rd N.
-
CompleteCivic & Health
Transit stop bench on US 98 North
A transit stop bench has been built on HWY 98 North.
-
CompleteCivic & Health
Transit Stop Bench Coming to 5047 US 98 North
A transit stop bench is being installed at 5047 Highway 98 North.
-
CompleteCivic & Health
First Baptist Institutional Church completes roof and patio cover replacement at 932 Martin Luther King Jr. Avenue
First Baptist Institutional Church has completed roof and patio cover work at its facility on Martin Luther King Jr. Avenue.
-
CompleteCivic & Health
Transit Stop Bench Installed at 4301 US 98 North
A transit stop bench has been installed at 4301 Highway 98 North.
-
CompleteCivic & Health
Transit stop bench installed on Highway 33 North
A transit stop bench has been installed on Highway 33 North.
-
CompleteCommercial
Bathroom remodel at 1600 Lake Parker Drive West
A bathroom remodel has been completed at a commercial space on Lake Parker Drive West.
-
CompleteCommercial
AC units replaced at 2420 South Florida Avenue
Air conditioning units have been replaced at a commercial property on Florida Avenue South.
-
CompleteCivic & Health
Bus shelter installed at 1202 Lakeland Hills Boulevard
A bus shelter was installed at 1202 Lakeland Hills Blvd.
-
CompleteCivic & Health
Transit Stop Bench Built at 1816 Kathleen Road
A transit stop bench has been built at 1816 Kathleen Road.
-
CompleteCivic & Health
Transit stop bench installed on US 98 North
A transit stop bench has been installed on Highway 98 North.
-
CompleteCivic & Health
Transit stop bench completed at Florida Avenue North
A transit stop bench is complete at 1302 Florida Avenue North.
-
CompleteCivic & Health
Transit Stop Bench Installed at 1775 Kathleen Road
A transit stop bench has been installed at 1775 Kathleen Road.
-
CompleteRetail & Dining
Gas canopy gets a refresh at 2385 Griffin Rd
A gas station canopy at 2385 Griffin Rd is receiving new fascia and signage.
-
CompleteCommercial
Fire Protection Systems Panel Replacement at 3919 Air Park Drive
A fire protection system panel replacement at 3919 Air Park Drive has been permitted.
-
CompleteCommercial
Air conditioning units replaced at 3033 Drane Field Road
Two 5-ton air conditioning systems were replaced at a commercial property on Drane Field Road.
-
CompleteCommercial
Aldi on South Florida Avenue added a rooftop solar system
The Aldi at 4532 Florida Ave S added a solar system, finaled in June 2026.
-
CompleteCivic & Health
Transit Stop Bench Added to Griffin Road
A transit stop bench has been installed at 1015 Griffin Road.
-
CompleteCivic & Health
Transit stop bench installed at 1030 Florida Ave N
A transit stop bench has been installed at 1030 Florida Ave N.
-
CompleteCivic & Health
Transit Stop Bench Installed at Parker Street West
A transit stop bench has been installed on Parker Street West.
-
CompleteCivic & Health
Transit stop shelter built on Gary Road East
A transit stop shelter with bench has been built on Gary Road East.
-
CompleteCivic & Health
The Joint Chiropractic is opening in the Shoppes of Lakeland
A chiropractic clinic has finished its buildout and put up its sign at 4145 US 98 N in north Lakeland.
-
CompleteRoads
SR 471 resurfacing from SR 35 to Sumter County Line is complete
A 6.8-mile stretch of SR 471 between SR 35 and the Sumter County line has been resurfaced.
-
CompleteRoads
SR 60 resurfacing from E Van Fleet Drive to Peace River Overflow Bridge is complete
A state road resurfacing project on SR 60 has finished.
-
CompleteRoads
SR 600 resurfacing between Fish Hatchery Road and Reynolds Road is complete
A state road resurfacing project on US 92 has finished.