Lakelandmarks
Built by Summit Labs β€” enterprise-grade systems, automation & technology leadership, at small‑business scale. Built by Summit Labs See what we do
Lakeland Winter Haven Auburndale Bartow Haines City Davenport Lake Wales Mulberry Polk City Fort Meade Frostproof I-4 US-27
Proposed Industrial

Gateway Warehouse site plan withdrawn at 5301 Gateway Blvd

A proposed warehouse project on Gateway Boulevard has been withdrawn from City review.

A site plan for Gateway Warehouse at 5301 Gateway Blvd was submitted to Lakeland in early 2026 but has since been withdrawn. The project was proposed on approximately 4 acres within an 8-acre parcel and was described as commercial warehouse use.

An environmental permit application (ERP 943236) for the same location was filed with the Southwest Florida Water Management District in June 2026 but remains incomplete as of late August 2026. The permit appears to modify an existing environmental authorization for the site.

What happens next

The site plan application has been withdrawn from Lakeland's review. The status of the environmental permit application with SWFWMD is unclear; it remains incomplete. Any future development would require a new site plan submission to the City.

Timeline

Feb 27
Site plan application window opened (SIT26-026)
Lakeland City Records SIT26-026 Β· City of Lakeland sign-in required
Jun 16
Environmental permit application filed with SWFWMD (ERP 943236)
SWFWMD ERP 943236 Β· District viewer is offline
Aug 26
Site plan application status: Withdrawn
Lakeland City Records SIT26-026 Β· City of Lakeland sign-in required

Receipts β€” verify every claim

These are the records this page is built from. None of them open directly right now β€” the agencies require a sign-in, or only offer a search form.

Spotted by the Lakelandmarks records pipeline Β· records checked Sep 5, 2026

Summaries are derived from public permit and agenda records and may contain errors β€” verify with the City of Lakeland or SWFWMD before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: City of Lakeland planning applications Β· SWFWMD environmental permits.