Every industrial project Lakelandmarks is tracking across Lakeland and Polk County — 87 projects, from first filing to opening day, each with receipts. See every project instead →
All tracked projects
-
In ReviewIndustrial
Triple E Management wants to shift land on East Main Street toward industrial use
A request to change two parcels at 3640 E Hwy 542 from residential to a business-park designation, with conditions limiting the intensity of industrial activity.
-
In ReviewIndustrial
TCI Logistics warehouse coming to New Tampa Highway
A 7,500 square foot light industrial warehouse is planned for 6210 New Tampa Highway.
-
In ReviewIndustrial
Metal building or parking planned for 160 2nd Ter, Winter Haven
A metal building or parking lot is proposed for 160 2nd Ter in Winter Haven.
-
Under ConstructionIndustrial
North Ridge Logistics Center is rising on Deen Still Road in Davenport
A 229,020-square-foot shell warehouse is going up at 450 E Deen Still Road in Davenport.
-
Under ConstructionIndustrial
Garage For Life finishes a buildout on Kendrick Lane as Nexatherm checks the zoning for a U.S. headquarters
A commercial building at 1530–1540 Kendrick Lane has been built out for Garage For Life, and recent zoning checks point to a warehouse and light-industrial headquarters for a company called Nexatherm.
-
In ReviewIndustrial
Warehouse planned for Gateway Boulevard
A warehouse is moving through Lakeland's approval process on Gateway Boulevard.
-
In ReviewIndustrial
Business park at Bartow Road to allow light industrial and wholesale
The owners of a business park at 1200 Highway 98 South are seeking to modify its zoning to permit light industrial and wholesale trade uses alongside existing office and commercial space.
-
In ReviewIndustrial
A Pipkin Creek office site could add wholesale and light-industrial uses
Owners of a Planned Unit Development at 4155 Pipkin Creek Road want to allow wholesale trade and light-industrial service uses alongside the office uses already approved there.
-
In ReviewIndustrial
Logistics Center Planned for 923 Wilkinson Road
A concept plan for a logistics center is under review at 923 Wilkinson Road.
-
Under ConstructionIndustrial
A 260,000-square-foot warehouse is going up at Lakeland Central Park
A new shell warehouse building of about 260,000 square feet is under construction on Winston Park Boulevard.
-
In ReviewIndustrial
TECO upgrading driveways at Pace Road substation in Auburndale
TECO is upgrading existing driveways at its Pace Road substation.
-
In ReviewIndustrial
Pole barn on Roundup Drive to become warehouse and office
An existing pole barn in Polk City is being converted to warehouse and office space for business and material storage.
-
In ReviewIndustrial
Metal Building for a Towing Shop Coming to CR 547 in Davenport
Site plan filed for a metal building to house a towing operation on CR 547.
-
In ReviewIndustrial
Peachtree Mobile Home and RV Park undergoes layout revision
MHP Operations LLC is modifying the existing Peachtree Mobile Home & RV Park, connecting to City sewer and consolidating its two entrances into one.
-
Under ConstructionIndustrial
Publix is building a warehouse and return center on County Line Road
Publix Super Markets is building a warehouse and return center at 2600 County Line Road, with site work and foundation permits already in hand.
-
Under ConstructionIndustrial
Southern Tire Mart is setting up a wholesale warehouse on Region Court
Southern Tire Mart is fitting out a wholesale warehouse at 5200 Region Court in east Lakeland.
-
PermittedIndustrial
Metal hangar planned at Lakeland Linder Airport
A metal building hangar is being constructed at 3919 Aero Pl near Lakeland Linder Airport.
-
PermittedIndustrial
Graham Packaging is adding to its plant on County Line Road
A concrete pad and new fire sprinklers are going in at the Graham Packaging plant at 1070 County Line Road.
-
In ReviewIndustrial
Warehouse and outdoor storage coming to 2529 Longhorn Avenue
An 8,000-square-foot warehouse and industrial outdoor storage facility proposed for 2529 Longhorn Avenue.
-
ProposedIndustrial
Directional boring contractor plans equipment storage building on Old Tampa Highway
A directional boring contractor is proposing a 1,200-square-foot storage and office building on a 2.87-acre vacant site along Old Tampa Highway.
-
In ReviewIndustrial
Industrial rezoning sought for 25 acres on Airport Road
The Woods family is asking Lakeland to rezone about 25 acres on Airport Road to allow medium-industrial and limited light-industrial uses.
-
ApprovedIndustrial
540A Self Storage gets one more year to break ground
An approved self-storage facility on CR 540A has won a one-year extension.
-
ProposedIndustrial
Warehouse and office use proposed in residential area near Skyview Drive
A conditional-use permit application seeks to allow warehouse and office space in a transitional area behind commercial zoning on Skyview Drive.
-
ProposedIndustrial
RV park coming to State Road 60 in Mulberry
A new RV park with storage building is planned for 4025 E Highway 60 in Mulberry.
-
In ReviewIndustrial
Packaging Center expands parking in Winter Haven
Additional parking and drainage planned for existing Packaging Center facility.
-
In ReviewIndustrial
Gulfstream Towers building a new tower on CR 547 in Davenport
Gulfstream Towers is constructing a new 180-foot tower on Highway 547 in Davenport.
-
In ReviewIndustrial
Southern Milling PUD planned for George Jenkins Boulevard
A planned unit development concept has been completed for the Southern Milling site on George Jenkins Boulevard.
-
Under ConstructionIndustrial
Amazon's MCO5 sortation center on Deen Still Road is getting a round of upgrades
Amazon's existing MCO5 sortation center off Deen Still Road is adding conveyor equipment, a new guardhouse, a new driveway and safety improvements.
-
ProposedIndustrial
Gateway Warehouse site plan withdrawn at 5301 Gateway Blvd
A proposed warehouse project on Gateway Boulevard has been withdrawn from City review.
-
In ReviewIndustrial
Pole barn for small animal auction coming to State Road 60 in Lake Wales
A pole barn is planned on Highway 60 in Lake Wales to host a once-weekly small livestock auction.
-
ApprovedIndustrial
Auto repair shop change of use approved at Cypress Gardens Road in Winter Haven
Justin Faltus Auto Glass Brands has received official land use approval to operate an auto repair shop at 3001 Cypress Gardens Road.
-
PermittedIndustrial
Warehouse space at Commerce Point Drive getting new tenant fit-out
A 33,600-square-foot commercial space at 2345 Commerce Point Drive is undergoing interior renovation and equipment installation.
-
PermittedIndustrial
Self-storage expansion approved for Hobbs Road in Auburndale
Pack Safe Storage is modifying its permit to expand Tymac Storage, a 5.1-acre commercial project on Hobbs Road.
-
PermittedIndustrial
Publix upgrades its deli plant and warehouse buildings on New Tampa Highway
Publix is reroofing warehouse and maintenance buildings and adding fire and life-safety systems across its Lakeland deli plant campus.
-
WithdrawnIndustrial
Auto parts recycling proposal withdrawn at 5320 North Combee Road
An auto parts recycling facility proposed for North Combee Road has been withdrawn from city review.
-
In ReviewIndustrial
Polk County expanding North Central Landfill with new cells
Polk County Solid Waste Division is designing and permitting new landfill cells at North Central Landfill in Winter Haven.
-
In ReviewIndustrial
Self-storage facility planned for Lake Hamilton Drive in Winter Haven
A self-storage facility is in review for a site on West Lake Hamilton Drive.
-
ProposedIndustrial
Lakeland HMA plant expanding asphalt cement production
Hot-mix asphalt producer adding three 30,000-gallon tanks and new control room at Reynolds Road facility.
-
ProposedIndustrial
Truck and equipment parking proposed for Winter Haven industrial site
A Winter Haven property used for truck parking could expand to include equipment sales and storage.
-
Under ConstructionIndustrial
A warehouse tenant is fitting out space on New Tampa Highway
A large industrial building on New Tampa Highway is being reworked for a tenant, with records tied to Star Distribution.
-
PermittedIndustrial
Industrial buildout and a rezoning move ahead along Drane Field Road
A commercial interior buildout at 4590 Drane Field Road has been permitted while nearby owners seek an industrial rezoning and update stormwater plans for a distribution site.
-
In ReviewIndustrial
Polk County builds warehouse and office complex in Bartow
Polk County is constructing a joint-use facility with warehouse, office, and support buildings on Bob Phillips Road.
-
Under ConstructionIndustrial
Phoenix Coating Resources is expanding its plant on SR 37 in Mulberry
Phoenix Coating Resources is building out and adding onto its facility at 2377 S Highway 37 in Mulberry.
-
ApprovedIndustrial
GrayLineX industrial land-use change wins adoption vote
On Jul 21, 2026, county commissioners approved the plan amendment at its adoption hearing.
-
ApprovedIndustrial
3.8 acres near SR 60 north of Mulberry cleared for industrial use
County commissioners approved changing 3.81 acres from suburban residential to industrial land use on a site west of State Road 60, north of Mulberry.
-
Under ConstructionIndustrial
Park 4 industrial buildings rising on University Boulevard
An industrial park known as Park 4@Lakeland is under construction off University Boulevard in southwest Lakeland.
-
Under ConstructionIndustrial
Juice Bowl Products upgrades fire protection systems
Fire suppression improvements at the juice-processing facility on Highway 98 South.
-
Under ConstructionIndustrial
A warehouse and storage yard is taking shape on New Tampa Highway
Site work and building permits are moving on a warehouse and storage project at 3070 New Tampa Highway, owned by Lakeland Storage 1 LLC.
-
In ReviewIndustrial
Peachtree Mobile Home & RV Park to connect to Lakeland sewer, relocate spaces
The existing 30-space Peachtree Mobile Home & RV Park on E. Peachtree Street seeks approval to relocate and reconfigure spaces while connecting to city sewer service.
-
PermittedIndustrial
A “Publix Fresh Kitchen” is coming together on New Tampa Highway
Fire-system permits describe a "Publix Fresh Kitchen" at Publix-owned property on New Tampa Highway.
-
PermittedIndustrial
Publix is bringing a warehouse and return center to County Line Road
Publix has pulled a $23.5 million site-work permit for a warehouse and return center on County Line Road.
-
In ReviewIndustrial
Industrial warehouse coming to New Tampa Highway
A 7,500-square-foot metal warehouse with office and breakroom space is in permit review on New Tampa Highway.
-
PermittedIndustrial
Publix warehouse and return center is moving ahead on County Line Road
Site work is cleared to begin on Publix's warehouse and return center at 2600 County Line Road.
-
PermittedIndustrial
A six-bay warehouse is finished on Pipkin Road in South Lakeland
A new shell warehouse at 3929 Pipkin Road S has had six tenant bays built out, with fire systems and trash enclosures now complete.
-
In ReviewIndustrial
Statewide Electrical Contractors plans Polk City headquarters relocation
An established electrical contracting company is exploring a move from Lakeland to a rural property north of Polk City.
-
In ReviewIndustrial
Industrial warehouse complex planned for Access Road in Davenport
A multi-building industrial warehouse development on about 24 acres near Access Road requires a land-use change from the county.
-
In ReviewIndustrial
Industrial rezoning proposed for Airport Road land
Owners want to rezone about 25 acres on Airport Road to allow medium and light industrial uses.
-
PermittedIndustrial
Monster Energy builds out a facility on Allen K Breed Highway
A run of building permits shows a Monster Energy operation taking shape at 5380 Allen K Breed Highway, with an interior buildout, two guardhouses, battery chargers and a new fence.
-
Under ConstructionIndustrial
Monster Energy is fitting out a guarded facility on Allen K Breed Highway
A string of permits — forklift chargers, a $700,000 interior buildout, new fencing and two guardhouses named for Monster Energy — point to the drink maker setting up at 5380 Allen K Breed Highway.
-
ApprovedIndustrial
An 8.6-acre site near Auburndale gets an industrial land-use label
Polk County approved a comprehensive-plan change turning about 8.59 acres off Recker Highway from Business Park Center to Industrial.
-
In ReviewIndustrial
Business park on Bartow Road seeks to allow light industrial uses
A 21.89-acre business park at 1200 Highway 98 South is seeking approval to add light industrial and wholesale trade uses to its existing office and commercial entitlements.
-
Under ConstructionIndustrial
A precast concrete maker is setting up at 304 Winston Creek Parkway in North Lakeland
A custom architectural precast concrete manufacturer is renovating an existing building and adding a small on-site batch plant at 304 Winston Creek Parkway.
-
In ReviewIndustrial
Research and Development Laboratory Coming to Kidron Road
A research and development facility of an industrial nature is proposed for 4020 Kidron Road.
-
Under ConstructionIndustrial
Apex Logistics is building a 202,000-square-foot warehouse on Highway 33 in North Lakeland
A roughly 202,471-square-foot warehouse called Apex Logistics is under construction at 8161 N Highway 33 in North Lakeland.
-
Under ConstructionIndustrial
BrightStar Lottery is building out space at 4000 Frontage Road
A $2.5 million interior remodel, new warehouse racking, fire sprinklers and a lit sign point to BrightStar Lottery taking space in an Interstate Commerce Park building off the I-4 frontage road.
-
Under ConstructionIndustrial
JBT Marel is adding storage and mechanical space at its Fairway Avenue building in Lakeland
An existing building at 400 Fairway Ave is getting attached storage space, a new mechanical room and new JBT Marel signage.
-
Under ConstructionIndustrial
O'Reilly's Lakeland distribution center is getting a major equipment overhaul
A string of permits shows conveyors, storage racking and interior work filling out the O'Reilly auto-parts distribution center on County Line Road.
-
Under ConstructionIndustrial
PECO Pallet is fitting out a facility on Whitten Road
PECO Pallet is building out space at 3075 Whitten Road in Lakeland with a roughly $1.3 million interior remodel and office work.
-
Under ConstructionIndustrial
Advance Auto Parts distribution center roof replacement at 4900 Frontage Road South
Roof replacement and fire protection system permitted at the Advance Auto Parts distribution center on Frontage Road South.
-
PermittedIndustrial
Tranzmotion sets up shop on Drane Field Road
A commercial space near Lakeland Linder has been fitted out with warehouse racking, a loading ramp, and a new Tranzmotion sign.
-
In ReviewIndustrial
Warehouse facility planned for Frontage Road campground in Davenport
A warehouse and distribution facility is planned for a 20-acre commercial campground on Frontage Road in Davenport.
-
In ReviewIndustrial
A return center is proposed on Allen K Breed Highway
A planned unit development described as a return center is under review at 5340 Allen K Breed Hwy in Lakeland.
-
ApprovedIndustrial
Existing warehouse complex on Recker Highway rezoned to match its business use
A 12.91-acre warehouse and outdoor storage complex on Recker Highway in Auburndale has been rezoned to Business Park Center to match its current use.
-
In ReviewIndustrial
FedEx Distribution Center in Davenport being renovated
FedEx is renovating its distribution center on North Ridge Trail in Davenport.
-
In ReviewIndustrial
Barnes Electric commercial warehouse planned on US 98 North
Barnes Electric is proposing a commercial warehouse on 8.73 acres on the eastern side of US 98 North.
-
Under ConstructionIndustrial
Heritage Landscape Supply warehouse and distribution at Combee Road
Heritage Landscape Supply is leasing a warehouse on South Combee Road to operate as a wholesale distributor of landscape materials and hardscape products.
-
Under ConstructionIndustrial
Bays fill in at Ruthven Business Park on Drane Field Road
A cluster of interior buildouts, drive-in ramps, and fire-system work is fitting out bays 19 through 23 at a business park off Drane Field Road.
-
In ReviewIndustrial
AJAX Paving Industries adding storage silos on Old Bartow Road, Lake Wales
AJAX Paving Industries is adding three silo foundations to its existing facility on Old Bartow Road.
-
PermittedIndustrial
Ronnie's Carpeting builds new storage building on US 98 North
Ronnie's Carpeting is replacing a storm-damaged storage building with a new masonry structure on N Highway 98.
-
In ReviewIndustrial
Clean Corps works to legalize warehouses and office buildings on Highway 547 in Davenport
An existing office, storage and warehouse complex on N Highway 547 is being put through after-the-fact permitting to bring it into compliance with county and state building codes.
-
In ReviewIndustrial
Industrial outdoor storage planned at 3306 Waterfield Road
A new owner plans to lease a 19,125-square-foot industrial building and adjacent land on Waterfield Road for outdoor storage, possibly paving part of the grassy area.
-
CompleteIndustrial
Hamilton Logistics #140 tenant buildout on Hamilton Road
A 317,746-square-foot industrial building on Hamilton Road has completed its tenant buildout, with zoning approval for outdoor storage.
-
In ReviewIndustrial
An industrial outdoor storage yard is planned on Winter Lake Road
Plans are under review for an industrial outdoor storage facility at 3532 Winter Lake Road in Lakeland.
-
In ReviewIndustrial
Stronghold Development builds storage warehouse on Lasso Lane
A 7,500-square-foot storage warehouse is coming to Lasso Lane.
-
CompleteIndustrial
Three industrial buildings coming to County Line Road
Three industrial buildings with parking and stormwater infrastructure are planned for County Line Road near Lakeland.
-
In ReviewIndustrial
S and S Welding seeks industrial zoning in Bartow
S and S Welding has requested industrial zoning for multiple parcels in Bartow near Carlton Parkway.
-
In ReviewIndustrial
Fuse Holdings seeks zoning and land-use changes on Industrial Park Road in Mulberry
Industrial Park Road property in Mulberry moving through approval process for use changes
Nothing matches that combination — yet.
The records pipeline runs every morning. New projects land here the day they surface.
Ask it in plain English instead →Sunday morning, five minutes, all caught up.