Lakelandmarks Ask
Built in Lakeland by Summit Labs. See how this site is built.
Lakeland Winter Haven Auburndale Bartow Haines City Davenport Lake Wales Mulberry Polk City Fort Meade Frostproof I-4 US-27
Under Construction Commercial

Mixed-use development Phase 2 rising at US 192 and Town Center Boulevard

Where it is. On US 192 At Town Center Boulevard in Davenport.

Phase 2 of a mixed-use development is under site preparation at US 192 and Town Center Boulevard in Davenport.

Phase 2 of a mixed-use project is underway at US Highway 192 and Town Center Boulevard in Davenport. Site work and mass grading are in process.

A 7-Eleven convenience store with fuel service was initially permitted for the site in late 2024, but those permits were withdrawn. The broader Phase 2 development now appears focused on site preparation and infrastructure.

What happens next

Site inspections are required as grading work proceeds.

Timeline

Nov 22, 2024
7-Eleven convenience store and fuel canopy permits filed
Polk County Building Permits BC-2024-1333, BC-2024-1334
Dec 5, 2024
Dumpster enclosure permit filed for 7-Eleven
Polk County Building Permit BC-2024-1374
Mar 18, 2025
Phase 2 mass grading site plan filed
Polk County Land Development LDNON-2025-39

Receipts β€” verify every claim

Every claim above links to the record it came from.

Spotted by the Lakelandmarks records pipeline Β· records checked Nov 3, 2026

Summaries are derived from public permit and agenda records and may contain errors β€” verify with Polk County before relying on them. Spotted a mistake? Tell us and we'll fix it fast.

Sources for this page: Polk County permit records.